|

Building activity in progress:
Four semi-detached hillside houses in Bollstanas, Upplands
Vasby, Stockholm.

T H E F
O U N D A T I O N
|
Foundation work
at the cold season, no problem.
Even surface layers without levels results in a fast laying
of ground. |
|
Easy to work. |
|
The gravel bed
carries the supporting thermal insulation which in turn supports
the bottom floor elements which are self suspended like the upper
floor elements. |
|
The straight ruler
shows .´s precision. |
|
The inner parts
of the foundation is now insulated.
The insulation encloses both the bottom floor elements
and the outer wall elements with a constant even thickness. |
|
No cold bridges
outwards to the winter cold or downwards to the ground. |
DES PHOTOS INSTALLATIONS
DES PHOTOS LES MURS DE L'ETAGE DE DESSUS
ET LE TOIT
DES PHOTOS LES ELEMENTS DE L'ETAGE DE
DESSUS PREMOULES
DES PHOTOS LE MONTAGE DES MURS PREMOULES
DES PHOTOS LE PLANCHER DU REZ DE CHAUSSEE
ET LES MURS (PREMOULES)
DES PHOTOS LES FOUNDATIONS
DES PHOTOS A L'USINE
PHOTOS LIST LISTE DES PHOTOS PRISES
SUR LE SITE DE CONSTRUCTION DE .
VERS LA
PAGE CONSTRUCTION DE LA .
LA PAGE
SYSTEM de RESARO
LA PAGE TECHNOLOGIE
de RESARO
LA HOME PAGE
de RESARO AB
RESARO AB
Storvretsvägen 39
142 31 Skogas
Tel & Fax +46(0)8 5413 7800
E-mail: info@resaro.se
Civ. Ing. George Wegler
technologie
| le
système pour des maisons | les
projets de construction | liste
des photos | info.
pour clients | problèmes
de construction
© Resaro AB
|